Reports
On this page, you will find summaries of reports related to the BASTA system. They provide guidance for those who want to learn more about how the BASTA system can be used in new construction projects.
Bygga med BASTA (in Swedish)
The key to non-toxic construction is selecting building and infrastructure products with a minimized content of hazardous chemical substances. Building responsibly creates benefits for both the environment and the economy.
Building with BASTA is a project carried out by IVL Swedish Environmental Research Institute, BASTAonline, Skanska, and the Swedish Transport Administration. The report is intended for stakeholders in the construction and civil engineering sector who wish to deepen their knowledge of non-toxic construction practices. It presents the results and experiences gained throughout the project.
Three pilot projects formed the core of the Building with BASTA initiative and provided the foundation for the project's other work packages: National Road 49, the North Värmland Operational Area, and a parking garage building at New Karolinska Solna. For the infrastructure projects, initiatives were selected where the Swedish Transport Administration's requirements for materials and products, as specified in TDOK 2012:22 and TDOK 2012:93, were included in the contract.
The final report from the "Building with BASTA" development project provides an overview of the construction process with regard to quality criteria, levels of ambition, and stakeholder roles.